| Reinforcement of Wadi Al Dawasir Power Plant Project
Central Operating Area (SEC-COA) scope of work includes
the installation of two (2) GT Units with all related Auxiliary
and the design, engineering, manufacturing, supply,
construction, erection, testing and commissioning of
supporting system and BOP equipment for relevant power
plant units The Power Plant Expansion inclu des but not
units. Power Expansion includes, but limited to complete 2 x PG7141 (FA) Gas Turbine and
hydrogen cooled generator with all BOP where BOP
includes main step up Transformers, Aux, Transformers ISO
phase Bus Duct, Generator Breaker, hydrogen generating
plant and CEMS.
|