Project Description

Reinforcement of Wadi Al Dawasir Power Plant Project Central Operating Area (SEC-COA) scope of work includes the installation of two (2) GT Units with all related Auxiliary and the design, engineering, manufacturing, supply, construction, erection, testing and commissioning of supporting system and BOP equipment for relevant power plant units The Power Plant Expansion inclu des but not units. Power Expansion includes, but limited to complete 2 x PG7141 (FA) Gas Turbine and hydrogen cooled generator with all BOP where BOP includes main step up Transformers, Aux, Transformers ISO phase Bus Duct, Generator Breaker, hydrogen generating plant and CEMS.


The Work is started.