The Major Works included in the Project are as following:
Civil Works
Site survey / soil investigation, Site preparation, Foundation works, Switchgear
Building, Administration Building, Workshops Buildings, Cable trench / duct
banks/pipe trench, Asphalt Roads, Perimeter Fence and Miscellaneous civil works.
Electrical Works
GT-Generator auxiliary systems (by GE), 2 x 13.8/380kV GSU Power Transformer,
Protection and Control System, 13.8/0.48kV Auxiliary and 13.8kV/4.16kv Starting
motor Transformers & BOP Transformers, MV & LV switchgears and Motor Control
Centers, DCS, 13.8kV Current Limiting Reactors, MV & LV power cables and control
cables, DC system and Inverter, Earthing System, Indoor / outdoor Lighting and
other miscellaneous electrical works.
Mechanical Works
2 x 66 MW Gas Turbine generating unit, Fuel System including Diesel & Crude oil
Forwarding & filtering skids, Distillate Treatment Plant, Crude Treatment Plant,
Crude Electric Heater, Pipe Works & Valves, Compressed Air System, Fire Fighting
System including piping, valves, hose cabinets and water deluge system, Water
supply system, HVAC system, Water Treatment System, Oil Bath Heater, Overhead
traveling crane and hoist, Exhaust stack and Drainage pump, Fuel Tanks for Crude
and Distillate, Metallic Portable Water Tank and Cathodic Protection System.
|