Major Equipments And Works
• GTG: Four units.
• Fuel System with 3X16,000 meter cube with floating roof tanks.
• Fire fighting and detection system.
• HVAC System
• Water Treatment
• 4X110 MVA 132/13.8kV GSU Power transformer, rated at 120%
of peak load.
• The extension of the existing GIS Switchgear (1-1/2 bus
scheme) by two bays.
• Auxiliary and BOP transformers and associated MV/LV
switchgears.
• Protection and control system: Interfacing with existing system.
• DCIS, SOE & FR Systems.
• GT-generator unit motor control centers.
• DC Systems: Batteries, battery chargers, UPS system, and
interfacing with existing systems.
• 132kV & 13.8kV XLPE cable system and its terminations.
• LV cabling system (for Power, Control, etc.)
• Cable Trays, trenches, etc.
• Earthing System, including extension and interfacing of new
addition to the existing system.
• Civil work including foundations, building and all other needed
civil works.
|