Major Equipments And Works
• GTG: 2X60.16MW units.
• Fuel System with 4X3750meter cube, tanks.
• Fire fighting and detection system.
• HVAC System.
• 2X110 MVA 132/13.8kV GSU Power transformer.
• Replacement of 2X50MVA GSU transformer of 13.8/33kV with 13.8/132kV transformer of 2 GTs (Unit#5
& Unit #6) including all
protection modifications.
• Auxiliary and BOP transformers and associated MV/LV switchgears.
• Protection and control system: Interfacing with existing system.
• GT-generator unit motor control centers.
• DC Systems: Batteries, battery chargers, UPS system, and interfacing with existing systems.
• 132kV & 13.8kV XLPE cable system and its terminations.
• LV cabling system (for Power, Control, etc.)
• Cable Trays, trenches, etc.
• Earthing System, including extension and interfacing of new addition to the existing system.
• Civil work including foundations, building and all other needed civil works.
|